Location
UAQ – United Arab Emirates
Done by
Idroesse Infrastrutture
Period
11/2013 -on going
Client
UAE Ministry of Public Works
Cost of the works
175 Million AED
Scope of Work
Study, design and supervise of a complete interchange free flow 4 legs two levels as improvement of the intersection of Al Ittihad Road with Umm Al Quwain – Falaj Al Mualla road.
Download the project card (file .pdf – 193 KB)