Call Us 8:00am - 5:00pm

+9712-447-5566

Monday to Friday

8:00am - 5:00pm

Email Us

info@idroesse.com

Project Details

Location: UAQ/RAK, United Arab Emirates

Chronology: 2009 – Completed

Client: UAE Ministry of Public Works

Cost of the Works:

  • 1st section: 164 Million AED
  • 2nd section: 139 Million AED
  • 3rd section: 70 Million AED

Scope of Works: Design and supervision of section 1 and design of 2nd and 3rd sections

Starting from Falaj-UAQ, the proposed road runs parallel on the South East of the Sheikh Mohammad Bin Zayed Road (E311) in the direction of Ras Al Khaimah.

The project was divided and developed in three different sections and phases:

  • 1st section from Falaj to Al Aqran – UAQ: The proposed road is approximately 13 km long, including the construction of a full cloverleaf interchange at the intersection of Falaj Al Mualla-Umm. Constructed
  • 2nd section from Al Aqran to Taween – UAQ: Total length 16 km. Under Construction
  • 3rd section from Taween – UAQ to RAK ring road: Total length 7 km. Design completed